Commit Graph

5 Commits

Author SHA1 Message Date
Hunor Csomortáni
343f1b9818 Tests: separate starting and watching the builds
This makes the tests more explicit, but also prepares the ground to
enable canceling test builds during session teardown in the future.

Signed-off-by: Hunor Csomortáni <csomh@redhat.com>
2019-12-06 12:33:44 +01:00
Mariana Ulaieva
4c8a92cb93 Integration test for the Cancel And Resume
Implement the integration test for the Cancel and Resume scenario.
2019-11-29 13:45:40 +01:00
Hunor Csomortáni
b41b6b9cc1 Tests: allow reusing an existing module build
Module builds take a long time to run, which can be a pain to wait for
during integration test development.

Instead of requiring developers to locally tweak the test code to be
able to reuse module builds, allow specifying the build ID of the module
build to be reused in test.env.yaml .

Signed-off-by: Hunor Csomortáni <csomh@redhat.com>
2019-11-20 14:27:33 +01:00
Mariana Ulaieva
6095ecc5fd Integration test for failed build
Implement the integration test for the failed build scenario.
2019-11-19 13:04:02 +01:00
Hunor Csomortáni
f5bf0d7252 Add integration test to check scratch module builds
Signed-off-by: Hunor Csomortáni <csomh@redhat.com>
2019-11-07 14:30:53 +01:00